metal buildings steel sheds steel garage steel frame buildings portable buildings
FIRST PART, OUR COMMENTS AND IDEAS:
1. | we design,fabricate,export,install following steel structure building projects: s design of aircraft hangar aircraft hangar doors airplane hangar industrial hangar arch hangar hangar door sliding hangar doors single slope steel building steel building motel inflatable buildings portable temporary structures building steel formwork profile steel building sliding garage door tugboat building curved steel building machinery steel strips polished metal building materials india famous buildings |
2.options | 1)we can design,fabricate,supply,export,install all kinds of steel structures welded parts,steel buildings,metal building,modular house,steel frame for warehouse,workshop,garage etc,steel beams,H beams,other riveting and welding parts |
| 2)we can also make and develop new parts according to customer's drawings and detailed dimensions. |
3. | specifications |
| 1)size:MOQ is 10m2,including width X length X eave height,roof slope |
| 2) Type:Single slope, double slope, muti slope; Single span, double-span, Multi-span, single floor, double floor,or three levels |
| 3) Base:Cement and steel foundation bolts |
| 4) Column and beam:Material Q345(S355JR)or Q235(S235JR) steel, all bolts connection! Straight cross-s cross-section! |
| 5) Bracing: X or V or other type bracing made from angle, round pipe, etc |
| 6) C or z purlin:Size from C120~C320, Z100~Z200 |
| 7) Roof and wall panel:Single colorfull corrugated steel sheet0.326~0.8mm thick, |
| YX28-205-820(820) sandwich panel with EPS, ROCK WOOL, PU etc insulation |
| thickness around 50mm~150mm, width |
| 8)Accessories:Semi-transparent skylight belts, Ventilators, down pipe, outer gutter, |
| 9)Surfrace: Paint or hot dip galvanize! |
| 10) Packing: Main steel frame without packing load in 40'OT, roof and wall panel load in 40'HQ! |
4 | design parameters, If you need we design for you, pls supply us the following parameter together with detail size: |
| 1)Live load on roof(KN/M2) |
| 2)Wind speed(KM/H) |
| 3)Snow load (KG/M2) if have |
| 4)Earthquake load if have |
| 5)Crane (if have) ,Crane span, crane lift height, max lift capacity, max wheel pressure and min whe |
| |
| |
| |
FIRST PART,Steel structure Aircraft maintenance hangar facilities
Location:Guangdong,China
Building type:aircraft maintenance hangar facilities
Construction area: 114421m2
Weight: 9513.09 metric ton
Layout(PDF):
Structural steelwork description:
New airport aircraft maintenance hangar facilities is locaed in South Area of New airport,total construction area is 114421m2,construction area of steel structure building is 23100m2,total structural steelwork consumption is 9513.09 metric ton,it is one of the biggest aircraft maintenance hangar facilities for span and covered area during finished and undertaking hangar facilities.
No.11 steel hangar is the centre of whole hangar,the length in south-north direction is 409.04 meters,the width in east-west direction is 134 meters,the maximum span of steel structure is 100 meters + 150 meters + 100 meters,the depth is 102.91 meters,it could simultaneously allow 4 wide-body jets to maintain.
No.11 steel hangar is divided into 3 areas:area 1 and area 2 is maintenance area,area 3 is painting area.Structure is steel structure column plus steel roofing system.The steel roofing consists of multi-grades steel truss system in longitudinal and
lateral direction,and roof bracing system:
1. The main truss node adopts welded H steel nodes;
2. The primary member adopts hot rolled H steel,BS5950,50 Grade,British Standard;
3. The roof bracing system adopts hot-rolled square tube and circular tube , BS5950,50 Grade,British Standard.
The construction of steel roofing in maintenance area adopt special techniques:
installing into one part on the ground,hydraulic hoisting through computer control.
The main construction characteristics and difficulties:
1. Huge hoisting area:the total hoisting area covered is 250m×88m,it is the biggest single building,using integral hoisting techniques to hoist in one time currently in CHINA.
2. Big hoisting weight,big span:the weight reaches 4432t,clear span in the structure is 150m,they are both rare in the similar steel construction projects.
3. Much more Hoisting point-positions:totally 13 hoisting point-positions,32 lifting jacks,the maximum capacity of jacks is 360t.